Field Trial
SafeZone Rail Completes Its First On Track Functional Trial
An overnight trial in Springburn moved SafeZone Rail beyond desk testing and demonstrated its core warning behaviour in a live railway environment.
1 min read · Omniscient Industries Limited

SafeZone Rail completed its first on-track functional trial during an overnight possession in the Springburn area on 22 to 23 August 2026. Two possession-support operatives used the mobile application at separate flank-protection locations at Sighthill East Junction and Sighthill West Junction.
The trial tested four core functions: displaying the operative's position, presenting railway context, monitoring a configured digital test zone and providing warning behaviour at the boundary. SafeZone Rail showed the worker marker against the local railway geography, displayed the simulated zones and generated an amber approach warning. During a controlled exit, the application delivered the intended notification and audible alarm.
This was an initial functional proof, not a survey-grade accuracy assessment or product acceptance test. Existing possession limits, physical protection, Safe Work Packs and operational instructions remained unchanged throughout. The next phase is to run a longer instrumented trial with timestamped event logging and reference-position checks so that accuracy, boundary repeatability and alert timing can be measured more rigorously.
Related

Company News
Introducing Omniscient Industries. Read article
A British engineering technology company building operational intelligence systems for rail and other complex physical industries.

Product and Engineering
SafeZone Rail Building Spatial Awareness for Railway Worksites. Read article
SafeZone Rail gives authorised users a clearer view of operative position, railway geography and configured safe work limits.